November 24, 2024

Marine Bridge In Lagos To Be Shut Down For 41 Days

0

The Marine Bridge in Apapa will be shut down by the Lagos State Government for repair from Friday, 10th November till Thursday 21st December, 2023.

This was confirmed by the Commissioner for Transportation, Oluwaseun Osiyemi.

 

According to Osiyemi, “In continuation of the repair works by the Federal Ministry of Works on the Marine Bridge, traffic will be diverted on the Bridge from Friday, 10th November till Thursday 21st December, 2023.

READ ALSO: I Can’t Wish This To Happen To Anybody – Gov Uzodinma Finally Apologises To NLC President

Consequently the following alternative routes will be open to motorists for the duration of the project; Motorists heading to Mobil Road from Ijora/Apapa Road will be diverted to Ijora to link Total Access Ramp inwards Malu Road to connect Mobil Road for their desired destinations. Motorists going to Ijora/Apapa will be diverted to the Apapa bound ramp of the Marine Bridge to make a U-turn at Point Road Junction inwards Marine Bridge to access their desired destinations.”

 

In the same vein, Osiyemi urged motorists to make use of Marine Bridge Access Road to Area B and make a U-turn at Point Junction Road towards Marine Bridge to continue their journeys.

Leave a Reply

Your email address will not be published. Required fields are marked *